Reports and ART · Qualified professional
Technical reports and attestations
Technical reports, written reports, inspections and attestations for properties, businesses and administrative cases, prepared by a qualified professional.

Quick answer
Technical reports and attestations in São Paulo, in a few lines
A technical report is the responsibility of an engineer or architect, each within their own qualifications, and it needs an ART (engineer's Technical Responsibility Record, registered at CREA) or RRT (architect's equivalent, registered at CAU) filed before the work. The most requested in São Paulo are attestations of installations and stability for City Hall, proofs of technical responsibility for the Fire Department, and building inspection under ABNT NBR 16747.
Updated on by the MTC technical team, based on the rules cited on this page.
- Who signs
- Qualified engineer or architect Source: Law No. 12.378/2010 (architecture and RRT)(opens in a new tab)
- Registration
- ART at CREA or RRT at CAU, before the service Source: CREA-SP: ART issuance(opens in a new tab)
- Building inspection
- ABNT NBR 16747 standard; national obligation still only a bill Source: Federal Senate: PL 159/2026 (mandatory building inspection)(opens in a new tab)
- Electric vehicle charging
- Technical responsibility required by IT-41 since March 17, 2026 Source: State Official Gazette: Ordinance CCB-003/970/2026 (IT-41, electric vehicle charging)(opens in a new tab)
What a technical report is
A technical report is a document signed by an engineer or architect that describes the condition of a property, a structure or an installation, with conclusions and recommendations.
It answers questions like: is the structure safe? Is the leak coming from the neighbor? Does the electrical installation meet the standard? Can the building take the new use? The answer has to be technical and documented.
The report is requested by public agencies, banks, condominiums, insurers and judges. It also helps the owner decide before buying, renovating or selling.
What MTC does
Technical inspection
On-site inspection with a photographic record.
Report or assessment
Technical document with conclusions and recommendations.
ART
Technical responsibility registered with the professional council.
Support in the case
Use of the report with the agency that required it.
Understand it in one image
Each part of the building, its own report
- 1Structure: stability report, signed by an engineer or another qualified professional.
- 2Electrical: attestation of the installations, according to NBR 5410 and the Fire Department's IT-41.
- 3Lightning protection: attestation of the lightning protection system (SPDA).
- 4Gas: attestation of the installations, when the building uses gas.
What a good technical report contains
Each part is needed for the document to be accepted.- 01 · InspectionOn-site inspection with a record
- 02 · AnalysisTechnical evaluation of the data
- 03 · ConclusionClear diagnosis and recommendations
- 04 · ARTRegistered technical responsibility
Which report the agency is asking for
A report is almost always requested by someone: City Hall, the Fire Department, the condominium or the neighbor. Knowing who is asking determines what the report must contain.
| Who asks | What they usually ask for |
|---|---|
| Fire Department | Proofs of technical responsibility for safety measures, electrical installations (IT-41), gas, generator and finishing materials |
| City Hall, for the Operating Permit | Attestations for electrical installations, lightning protection, structural stability, safety equipment, accessibility and gas |
| City Hall, for the ALF | Declarations signed by a qualified professional for buildings over 150 m² |
| Condominium | Building inspection under ABNT NBR 16747, currently hired voluntarily |
| Neighboring construction | Precautionary report on neighboring properties (laudo cautelar de vizinhança), by contract between the parties |
Why get a technical report
From doubt about the property to a technical diagnosis
Each card shows a common problem. Tap a problem to see how it is solved.
What happens without a report
Without a technical diagnosis, the problem grows: the case stalls, the damage increases or the dispute drags on. The sooner the report is done, the more options are left.
- 1
Doubt or requirement
An agency asks for the report or a problem appears in the property.
What can be doneDefine the purpose of the report and schedule the inspection.
- 2
Case stalled
Without the document, the application does not advance at the agency.
What can be doneDeliver the report with ART and answer the requirement.
- 3
Greater damage
Cracks, leaks or faults grow over time.
What can be doneFollow the report's recommendations and prioritize the fixes.
- 4
Dispute or liability
Without technical evidence, the discussion drags on or the owner answers alone.
What can be doneUse the report as evidence in negotiations and cases.
Without a report, the problem shows up here
In cases
- Stalled applicationsAgencies do not move forward without the document.
- Missed deadlinesRequirements expire unanswered.
On the property
- Greater damageUntreated problems get worse.
- Wrong renovationWork without a diagnosis costs more.
On responsibility
- Insurance deniedNo technical proof of the damage.
- Long disputesWithout evidence, the negotiation drags on.
Received a request for a report? Send a photo of the document.
Chat on WhatsAppWhat the report brings to the owner
Informed decisions
Clear diagnosis of the property or installation.
Accepted document
Meets the requirements of public agencies, banks and condominiums.
Technical evidence
Basis for negotiations, insurance and cases.
Prevention
Problems identified before they turn into losses.
Property value
A property with an up-to-date report inspires more confidence.
Technical responsibility
Signed by a qualified professional, with ART.
When it is needed
- Requirement from City Hall, the Fire Department or the registry office
- Buying or selling a property
- Renovation or change of use
- Damage, cracks or leaks
- Request from an insurer, bank or condominium
Documents that help you get started
You do not need all of them. The team will tell you what is missing.
- Address and access to the site
- Property record or contract
- Existing plans, if there are any
- Requirement received, if any
- Photos of the problem, if there are any
How we handle your case
- 1
Understanding
Purpose of the report and the agency that requires it.
- 2
Inspection
Technical inspection on site.
- 3
Analysis
Evaluation of the data collected.
- 4
Report and ART
Final signed document.
Support
Use of the report in the case.
- The type of report depends on the purpose and on who requires it.
- Some reports require specific tests or equipment.
- The report reflects the condition of the property on the date of the inspection.
Questions about technical reports and attestations
The questions that come to the team and show up in searches most often, with the answer and the source.
See all questionsA report is the responsibility of engineers and architects, but always within each one's qualifications. An electrical report, for example, is signed by a professional qualified for that.
Source: Law No. 12.378/2010 (architecture and RRT) (opens in a new tab)Yes. Reports and expert assessments go into the work or service ART at CREA, registered before the work starts. For architects, the registration is the RRT at CAU.
Source: CREA-SP: ART issuance (opens in a new tab)There is no national obligation yet: Bill PL 159/2026, which creates the Technical Building Inspection Report (Laudo de Inspeção Técnica de Edificação), is awaiting a vote in the Senate. The technical standard for inspection is ABNT NBR 16747, and a condominium can hire it voluntarily today.
Source: Federal Senate: PL 159/2026 (mandatory building inspection) (opens in a new tab)Proofs of technical responsibility, including for the installation and maintenance of safety measures, gas, generator, electrical compliance under IT-41, and finishing materials.
Source: São Paulo Fire Department: Technical Instruction No. 01/2025 (procedures and validity, Annex K) (opens in a new tab)For the Operating Permit (Alvará de Funcionamento), attestations for electrical installations, lightning protection, fire brigade, structural stability, safety equipment, accessibility and gas. For the ALF (Operating License Document) in buildings over 150 m², declarations signed by a qualified professional.
Source: Decree No. 49.969/2008 (operating license) (opens in a new tab)The installation needs a qualified professional with an ART or RRT (State Law 18.403/2026), and since March 17, 2026 the Fire Department's IT-41 sets out the charging rules, checked at AVCB renewal.
Source: State Official Gazette: Ordinance CCB-003/970/2026 (IT-41, electric vehicle charging) (opens in a new tab)Legal basis and sources
- Law No. 6.496/1977 (ART)(opens in a new tab)
- Law No. 12.378/2010 (architecture and RRT)(opens in a new tab)
- CREA-SP: ART issuance(opens in a new tab)
- Decree No. 49.969/2008 (operating license)(opens in a new tab)
- São Paulo Fire Department: Technical Instruction No. 01/2025 (procedures and validity, Annex K)(opens in a new tab)
- State Official Gazette (Diário Oficial): Ordinance CCB-003/970/2026 (IT-41, electric vehicle charging)(opens in a new tab)
Informational content, reviewed on October 22, 2026. The rules may change; the analysis of each case considers the rule in force on the date of the application. MTC is a private company, not affiliated with government agencies.
Related services
- Technical responsibility: ARTART issued by qualified professionals registered with CREA, according to the technical service performed.See service
- Safety CertificateAnalysis and adaptation of existing buildings to the conditions of safe use required by municipal law.See service
- Fire Department: AVCB and CLCBAnalysis, technical design, ART, guidance on required upgrades, and follow-up of the case at the São Paulo State Fire Department.See service