Authorization Permit for events
Venue analysis, occupancy calculation, attestations with ART and the Authorization Permit (Alvará de Autorização) application at City Hall, so your event with more than 250 people can open its doors without risk of a fine or closure.

Quick answer
Authorization Permit for events in São Paulo, in a few lines
In São Paulo, a public, temporary event with more than 250 people, with or without ticket sales, requires City Hall's Authorization Permit (Alvará de Autorização), under Decree 49.969/2008. The application goes to the Municipal Secretariat for Urban Planning and Licensing at least 30 days in advance, with an occupancy calculation, approvals from other agencies and technical attestations with ART for the stage, structures and installations; an event with a fenced-off area also needs the Fire Department license, requested separately. An event without authorization is fined per square meter of land. MTC analyzes the venue, prepares the technical part with engineers and architects and follows the application through to the permit.
Updated on by the MTC technical team, based on the rules cited on this page.
- When it is required
- Public event with more than 250 people Source: Decree No. 49.969/2008 (Authorization Permit for events, arts. 5, 24 and 42)(opens in a new tab)
- Advance notice
- Application at least 30 days ahead Source: Decree No. 49.969/2008 (Authorization Permit for events, arts. 5, 24 and 42)(opens in a new tab)
- Validity
- Up to 6 months, extendable once Source: Decree No. 49.969/2008 (Authorization Permit for events, arts. 5, 24 and 42)(opens in a new tab)
- Event without a permit
- R$ 20 per m² of land, 2016 value Source: Law No. 16.402/2016, art. 138 and Table 5 (fine for an event without authorization)(opens in a new tab)
What the Authorization Permit for events is
The Authorization Permit (Alvará de Autorização) is São Paulo City Hall's license for a public, temporary event with more than 250 people, with or without ticket sales: a concert, party, fair, conference, religious or sports event. It applies to public or private property, a lot, a parking lot, a street, a square or a park (Decree 49.969/2008). The application goes to the Municipal Secretariat for Urban Planning and Licensing, which reviews the event's safety conditions.
The application must be filed at least 30 days in advance, and filing alone does not authorize the event. The Zoning Law sets a fine of R$ 20 per square meter of land for an event without authorization, a 2016 value adjusted by the IPCA, and the permit can be revoked at any time. At the Fire Department, holding a temporary event without a license is a very serious violation.
What usually holds things up is the technical part: occupancy and exit calculations, the safety design, approvals from CET and the Health Department, and attestations with ARTTechnical Responsibility Record (Anotação de Responsabilidade Técnica). A CREA record that identifies the engineer responsible for a project, technical report, or construction work. for the stage, roof structure, bleachers, electrical installations, grounding and lightning protection. And City Hall's requirements allow only 5 days for a response. MTC analyzes the venue, puts together the technical documentation with engineers, architects and partners, and follows the application through to the permit.
What MTC does
Site review
Audience, area, exits and the licenses the venue already has.
Occupancy and safety
Risk level, occupancy calculation, evacuation flow and design.
Technical attestations
Stage, roof structure and bleachers with ARTTechnical Responsibility Record (Anotação de Responsabilidade Técnica). A CREA record that identifies the engineer responsible for a project, technical report, or construction work. or RRTRRT (Technical Responsibility Record). The equivalent of the ART for architects, registered with the CAU..
Application and follow-up
Filing at City Hall, requirements answered within 5 days, and the permit.
Understand it in one image
The 5 stages of the event permit
- 1
Site review
Audience, area, exits and the licenses the venue already has.
- 2
Risk level
An official points scale defines the documents.
- 3
Occupancy and attestations
Audience calculation and attestations with ART or RRT.
- 4
Application and approvals
30 days ahead: City Hall, CET, Health Department and Military Police.
- 5
Event cleared
Permit issued and kept at the event site.
Venue with an Operating Permit? The path depends on the audience, the stage and the capacity. MTC checks your case before the event.
What City Hall reviews in your event
Each item becomes a document or an attestation.- 01 · AudienceOccupancy and emergency exits
- 02 · StructuresStage, tent, roof structure and bleachers
- 03 · InstallationsElectrical, grounding and lightning protection
- 04 · SurroundingsTraffic, health, security and noise
Does your event need the Authorization Permit?
The decree sorts cases by audience and by venue. It is the first check MTC does, before the date and the venue contract are closed.
1Up to 250 people
Outside the Authorization Permit. In a street or square, use of the space is authorized by the local Subprefeitura.
2More than 250 people on a lot or in a parking lot, warehouse, street, square or park
Authorization Permit from City Hall, requested at least 30 days in advance.
3Assembly venue with a valid Operating Permit, only in the licensed areas and without changes
Exempt from the Authorization Permit, as long as maximum occupancy is controlled.
4The same licensed venue, but with a stage, tent or bleachers set up for the event
It loses the exemption and needs the Authorization Permit.
5Audience also in the courtyard, garden or parking lot
It needs the permit. In the parking lot, the event cannot take up the building's mandatory parking spaces.
6The activity will continue beyond the 6 months and the extension
The person in charge is notified to apply for the venue's Operating Permit.
An event with a fenced-off area also needs the Fire Department license, requested separately. MTC checks both paths when analyzing the venue.
Source: Decree No. 49.969/2008 (Authorization Permit for events, arts. 5, 24 and 42)(opens in a new tab)Why apply for the permit
From an event at risk to an event cleared
Each card shows a common problem. Tap a problem to see how it is solved.
What happens to an event without a permit
The permit only applies once it is issued: filing the application does not authorize the event. At City Hall and the Fire Department, the path is usually as follows, and the deadline to correct problems is short.
- 1
Requirements notice
Gaps in the application become a notice, with 5 days to respond, extendable once.
What can be doneAnswer everything within the deadline, with the right technical documents.
- 2
Denial
Without a response within the deadline, the application is denied for abandonment. The appeal period is only 5 days.
What can be doneAppeal within 5 days or file a new application, if there is still time.
- 3
City Hall fine
Event without authorization: R$ 20 per m² of land, 2016 value adjusted by the IPCA.
What can be doneApply for the permit before closing the date and the venue contract.
- 4
Fire Department: fine and closure
A very serious violation, a fine of up to 10,000 UFESP and closure if there is a risk to the public.
What can be doneFix everything before opening: at the event, there is no extra time.
Beyond City Hall: what an event without a permit costs
At the event
- Disappointed audienceRefunded tickets and a damaged brand.
- Lost dateVenue, acts and crew already booked.
In the contracts
- Venue ownerCan also be fined for the irregular use.
- Supplier without an ARTA stage without a technical manager holds up the application.
In finances
- Fines add upCity Hall and the Fire Department fine separately.
- Wasted setupStructures set up and taken down for nothing.
Holding an event with more than 250 people? Contact MTC before you lock in the date and the venue.
Chat on WhatsAppWhat a permitted event brings
Event cleared
Permit issued before opening.
Safe public
Occupancy, exits and structures checked.
Deadline under control
Application filed with the right lead time.
Attestations in order
Technical documents with ART or RRT.
Enforcement without worry
Permit and documents at hand on site.
Future editions
A ready basis to repeat or extend.
When it is needed
- Concert, festival or party with more than 250 people
- Fair, exhibition or conference at a venue without an assembly venue permit
- Event on a lot, in a parking lot, warehouse or outdoor area
- Event in a street, square or park
- Stage, tent or bleachers at an already licensed venue
- Circus, amusement park or event lasting several weeks
Documents that help you get started
You do not need all of them. The team will tell you what is missing.
- Event details: dates, times, program and expected audience
- Articles of incorporation and CNPJ of the promoter or organizer
- Contract or authorization from the venue owner
- The property's IPTU, or a permit agreement if the area is public
- Floor plan or sketch of the venue and the planned structures
- Contract with the security company, if already in place
How we handle your case
- 1
Site review
Audience, area, exits and the licenses the venue already has.
- 2
Risk level and occupancy
Risk scale, occupancy calculation and evacuation flow.
- 3
Design and attestations
Drawings and attestations with ART or RRT.
- 4
Application and approvals
Filing with City Hall, CET, the Health Department and the Military Police.
Event cleared
Authorization Permit issued for the event dates.
- Filing the application does not authorize the event: only the issued permit does.
- The application must be filed at least 30 days in advance.
- The Fire Department license for the event is requested separately.
- The electrical and lightning-protection attestations come from an electrical engineer; MTC organizes them with partners.
Questions about the Authorization Permit for events
The questions that come to the team and show up in searches most often, with the answer and the source.
See all questionsThe Authorization Permit is required for a public, temporary event with more than 250 people, with or without ticket sales, on public or private property, a lot, a parking lot, a street, a square or a park. The rule also applies to events held by the government. An assembly venue that already has an Operating Permit is exempt if the event does not change the licensed space.
Source: Decree No. 49.969/2008 (Authorization Permit for events, arts. 5, 24 and 42) (opens in a new tab)It does not need City Hall's Authorization Permit. But an event in a street, square or other public area depends on authorization from the local Subprefeitura, which has its own rules. In Pinheiros, for example, the request is filed at least 30 days in advance.
Source: São Paulo City Hall (Subprefeitura Pinheiros): authorization for events in public areas (opens in a new tab)At least 30 days before the event date. City Hall has up to 30 days to issue the permit, counted from when the documentation is complete. If a requirements notice comes, there are only 5 days to respond; without a response, the application is denied.
Source: Decree No. 49.969/2008 (Authorization Permit for events, arts. 5, 24 and 42) (opens in a new tab)Among others: the event's descriptive report, plans, an occupancy and evacuation calculation signed by a qualified professional, a contract with a security company, official letters to the Military Police and the Subprefeitura, and approvals from CET and the Health Department. The list grows according to the event's risk level, calculated on an official points scale.
Source: São Paulo City Hall (SMUL): Authorization Permit for Temporary Events (opens in a new tab)Yes. The stability of the stage, tent, roof structure and bleachers, electrical installations, grounding, lightning protection (SPDA), fire protection system, fire brigade, accessibility and noise are proven by attestations with ART or RRT. For a low-risk event, a statement of commitment is accepted, also with ART or RRT.
Source: São Paulo City Hall (SMUL): Technical Booklet No. 01, Authorization Permit for Temporary Events (opens in a new tab)Up to 6 months, and it can be extended only once, for the same period, with a new payment. If the activity continues at the venue after that, the person in charge is notified to apply for the Operating Permit. The permit must be kept at the event site while the event takes place.
Source: Decree No. 49.969/2008 (Authorization Permit for events, arts. 5, 24 and 42) (opens in a new tab)Yes. Under the state regulation, a temporary occupancy with an area enclosed by barriers is regularized with the Fire Department before the event starts, with control of public access. Inside a building, the building's license must also be valid. Holding a temporary event without the license is a very serious violation.
Source: State Decree No. 69.118/2024 (Fire Safety Regulation) (opens in a new tab)The Zoning Law sets R$ 20 per square meter of the land where the event takes place, a 2016 value adjusted every year by the IPCA. Both the venue owner and the person responsible for the event can be fined. The Fire Department applies its own fines separately.
Source: Law No. 16.402/2016, art. 138 and Table 5 (fine for an event without authorization) (opens in a new tab)Legal basis and sources
- Decree No. 49.969/2008 (Authorization Permit for events, arts. 5, 24 and 42)(opens in a new tab)
- São Paulo City Hall (SMUL): Authorization Permit for Temporary Events(opens in a new tab)
- São Paulo City Hall (SMUL): Technical Booklet No. 01, Authorization Permit for Temporary Events(opens in a new tab)
- Law No. 16.402/2016, art. 138 and Table 5 (fine for an event without authorization)(opens in a new tab)
- State Decree No. 69.118/2024 (Fire Safety Regulation)(opens in a new tab)
- Decree No. 64.724/2025 (professionals' responsibility for declarations and attestations)(opens in a new tab)
- São Paulo City Hall (SMUL): Operating Permit for Assembly Venues (Alvará de Funcionamento para Local de Reunião)(opens in a new tab)
Informational content, reviewed on November 11, 2026. The rules may change; the analysis of each case considers the rule in force on the date of the application. MTC is a private company, not affiliated with government agencies.
Related services
- Fire Department: AVCB and CLCBAnalysis, technical design, ART, guidance on required upgrades, and follow-up of the case at the São Paulo State Fire Department.See service
- Operating LicenseObtaining or regularizing the license for the business to operate at the property, with a review of the site and the activity before the application.See service
- Safety CertificateAnalysis and adaptation of existing buildings to the conditions of safe use required by municipal law.See service